ATCP 93.710(4)(b)1. 1. Reference in the letter to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.710(4)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.95 (d) shall be deleted.
ATCP 93.710 Note Note: A link to 40 CFR 280 is available at the following EPA Web site: http://www.epa.gov/oust/fedlaws/otgg_final080807.pdf
ATCP 93.710(5) (5) If an owner or operator using the test to provide financial assurance finds that he or she no longer meets the requirements of the financial test based on the year-end financial statements, the owner or operator shall obtain alternative coverage within 150 days of the end of the year for which financial statements have been prepared.
ATCP 93.710(6) (6) The department may require reports of financial condition at any time from the owner or operator, or guarantor, or both. If the department finds, on the basis of such reports or other information, that the owner or operator, or guarantor, or both, no longer meet the financial test requirements of either sub. (2) or (3) and sub. (4), the owner or operator shall obtain alternate coverage within 30 days after notification of such a finding.
ATCP 93.710(7) (7) If the owner or operator fails to obtain alternate assurance within 150 days of finding that he or she no longer meets the requirements of the financial test based on the year-end financial statements, or within 30 days of notification by the department that he or she no longer meets the requirements of the financial test, the owner or operator shall notify the department of such failure within 10 days.
ATCP 93.710 History History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19; correction in (7) made under s. 35.17, Stats., Register October 2019 No. 766.
ATCP 93.713 ATCP 93.713Guarantee.
ATCP 93.713(1)(1)To use a guarantee to meet the financial responsibility requirements of s. ATCP 93.705, an owner or operator shall obtain a guarantee that conforms to the requirements of this section. The guarantor shall be a firm that is engaged in a substantial business relationship with the owner or operator and issues the guarantee as an act incident to that business relationship or the guarantor shall be a firm that meets at least one of the following requirements:
ATCP 93.713(1)(a) (a) The firm possesses a controlling interest in the owner or operator.
ATCP 93.713(1)(b) (b) The firm possesses a controlling interest in a firm described under par. (a).
ATCP 93.713(1)(c) (c) The firm is controlled through stock ownership by a common parent firm that possesses a controlling interest in the owner or operator.
ATCP 93.713(2)(a) (a) Within 120 days of the close of each financial reporting year, the guarantor shall demonstrate that it meets the financial test criteria of s. ATCP 93.710 based on year-end financial statements for the latest completed financial reporting year by completing the letter from the chief financial officer described in s. ATCP 93.710 (4), and the guarantor shall deliver the letter to the owner or operator.
ATCP 93.713(2)(b) (b) If the guarantor fails to meet the requirements of the financial test at the end of any financial reporting year, within 120 days of the end of that financial reporting year, the guarantor shall send notice by certified mail to the owner or operator before cancellation or non-renewal of the guarantee.
ATCP 93.713(2)(c) (c) If the department notifies the guarantor that he or she no longer meets the requirements of the financial test of s. ATCP 93.710 (2) or (3), the guarantor shall notify the owner or operator within 10 days of receiving such notification from the department.
ATCP 93.713(2)(d) (d) Under either par. (b) or (c), the guarantee shall terminate no less than 120 days after the date the owner or operator receives the notification as evidenced by the return receipt.
ATCP 93.713(2)(e) (e) The owner or operator shall obtain alternative coverage as specified in s. ATCP 93.753.
ATCP 93.713(3) (3) The guarantee shall be worded exactly as found in 40 CFR 280.96 (c) except for the following:
ATCP 93.713(3)(a) (a) The instructions in brackets in the guarantee shall be replaced by the relevant information and the brackets deleted.
ATCP 93.713(3)(b) (b) If financial responsibility for aboveground tanks within the scope of this subchapter is demonstrated using this method, all of the following changes shall be made:
ATCP 93.713(3)(b)1. 1. Reference in the guarantee to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.713(3)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.96 (c) shall be deleted.
ATCP 93.713 Note Note: A link to 40 CFR 280 is available at the following EPA Web site: http://www.epa.gov/oust/fedlaws/cfr.htm.
ATCP 93.713(4)(a) (a) An owner or operator who uses a guarantee to satisfy the requirements of s. ATCP 93.705 shall establish a standby trust fund when the guarantee is obtained.
ATCP 93.713(4)(b) (b) Under the terms of the guarantee, all amounts paid by the guarantor under the guarantee shall be deposited directly into the standby trust fund in accordance with instructions from the department under s. ATCP 93.747.
ATCP 93.713(4)(c) (c) This standby trust fund shall meet the requirements for standby trust funds in s. ATCP 93.725.
ATCP 93.713 History History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19.
ATCP 93.715 ATCP 93.715Insurance and risk retention group coverage.
ATCP 93.715(1)(1) To use insurance and risk retention group coverage to meet the financial responsibility requirements of s. ATCP 93.705, an owner or operator shall obtain liability insurance that conforms to the requirements of this section from a qualified insurer or risk retention group. Such insurance may be in the form of a separate insurance policy or an endorsement to a current insurance policy.
ATCP 93.715(2) (2) “ Termination,” as used in the forms required under this section, means only those changes that would result in a gap in coverage as where the insured has not obtained required coverage or has obtained required coverage with a different retroactive date than the retroactive date of the original policy.
ATCP 93.715(3) (3) Each insurance policy shall be issued by an insurer or a risk retention group that is licensed to transact the business of insurance or eligible to provide insurance as an excess or surplus lines insurer in one or more states.
ATCP 93.715(4) (4) Each insurance policy shall be amended by an endorsement worded as specified in 40 CFR 280.97 (b) (1), or evidenced by a certificate of insurance worded as specified in 40 CFR 280.97 (b) (2), except for the following:
ATCP 93.715(4)(a) (a) The instructions in brackets in the endorsement or certificate shall be replaced by the relevant information and the brackets deleted.
ATCP 93.715(4)(b) (b) If financial responsibility for aboveground tanks within the scope of this subchapter is demonstrated using this method, all of the following changes shall be made:
ATCP 93.715(4)(b)1. 1. Reference in the endorsement or certificate to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.715(4)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.97 (b) (1) or (2) shall be deleted.
ATCP 93.715 Note Note: A link to 40 CFR 280 is available by accessing the following Web site: http://www.epa.gov/oust/fedlaws/cfr.htm.
ATCP 93.715(6)(a) (a) If the insurer or group terminates coverage for any reason, the insurer or group shall notify the department of such termination at the same time the insured is notified.
ATCP 93.715(6)(am) (am) If the operator is the insured and the insurance lapses or is terminated, the insurer or group shall notify the owner of the property at the same time the insured is notified.
ATCP 93.715(6)(b) (b) If the insured allows coverage to lapse or changes insurers or groups, the insured shall notify the department within 10 days.
ATCP 93.715 History History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19.
ATCP 93.717 ATCP 93.717Surety bond.
ATCP 93.717(1)(1)To use a surety bond to meet the financial responsibility requirements of s. ATCP 93.705, an owner or operator shall obtain a surety bond that conforms to the requirements of this section. The surety company issuing the bond shall be listed as an acceptable surety on federal bonds in the latest Circular 570 of the U.S. department of the treasury.
ATCP 93.717(2) (2) The surety bond shall be worded exactly as found in 40 CFR 280.98 (b), except for the following:
ATCP 93.717(2)(a) (a) The instructions in brackets in the surety bond shall be replaced by the relevant information and the brackets deleted.
ATCP 93.717(2)(b) (b) If financial responsibility for aboveground tanks within the scope of this subchapter is demonstrated using this method, all of the following changes shall be made:
ATCP 93.717(2)(b)1. 1. Reference in the surety bond to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.717(2)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.98 (b) shall be deleted.
ATCP 93.717 Note Note: A link to 40 CFR 280 is available at the following EPA Web site: http://www.epa.gov/oust/fedlaws/cfr.htm.
ATCP 93.717(3) (3) Under the terms of the bond, the surety shall be liable on the bond obligation when the owner or operator fails to perform as guaranteed by the bond. In all cases, the surety's liability is limited to the per-occurrence and annual aggregate penal sums.
ATCP 93.717(4)(a) (a) The owner or operator who uses a surety bond to satisfy the requirements of s. ATCP 93.705 shall establish a standby trust fund when the surety bond is acquired.
ATCP 93.717(4)(b) (b) Under the terms of the bond, all amounts paid by the surety under the bond shall be deposited directly into the standby trust fund in accordance with instructions from the department under s. ATCP 93.747.
ATCP 93.717(4)(c) (c) This standby trust fund shall meet the requirements for standby trust funds in s. ATCP 93.725.
ATCP 93.717(5) (5) The owner of the property on which tanks are located has ultimate responsibility under this chapter and shall be listed as a co-beneficiary of any policy issued.
ATCP 93.717 History History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19.
ATCP 93.720 ATCP 93.720Letter of credit.
ATCP 93.720(1)(1)To use a letter of credit to meet the financial responsibility requirements of s. ATCP 93.705, an owner or operator shall obtain an irrevocable standby letter of credit that conforms to the requirements of this section. The issuing institution shall be authorized to issue letters of credit in each state where the letters are used and the institution's letter of credit operations shall be regulated and examined by a federal or state agency.
ATCP 93.720(2) (2) The letter of credit shall be worded exactly as found in 40 CFR 280.99 (b), except for the following:
ATCP 93.720(2)(a) (a) The instructions in brackets in the letter shall be replaced by the relevant information and the brackets deleted.
ATCP 93.720(2)(b) (b) If financial responsibility for aboveground tanks within the scope of this subchapter is demonstrated using this method, all of the following changes shall be made:
ATCP 93.720(2)(b)1. 1. Reference in the letter to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.720(2)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.99 (b) shall be deleted.
ATCP 93.720 Note Note: A link to 40 CFR 280 is available at the following EPA Web site: http://www.epa.gov/oust/fedlaws/cfr.htm.
ATCP 93.720(3)(a) (a) An owner or operator who uses a letter of credit to satisfy the requirements of s. ATCP 93.705 shall also establish a standby trust fund when the letter of credit is acquired.
ATCP 93.720(3)(b) (b) Under the terms of the letter of credit, all amounts paid pursuant to a draft by the department shall be deposited by the issuing institution directly into the standby trust fund in accordance with instructions from the department under s. ATCP 93.747.
ATCP 93.720(3)(c) (c) This standby trust fund shall meet the requirements for standby trust funds in s. ATCP 93.725.
ATCP 93.720(4)(a) (a) The letter of credit shall be irrevocable with a term specified by the issuing institution.
ATCP 93.720(4)(b) (b) The letter of credit shall provide that credit be automatically renewed for the same term as the original term, unless, at least 120 days before the current expiration date, the issuing institution notifies the owner or operator by certified mail of its decision not to renew the letter of credit.
ATCP 93.720(4)(c) (c) Under the terms of the letter of credit, the 120 days shall begin on the date the owner or operator receives the notice as evidenced by the return receipt.
ATCP 93.720 History History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19.
ATCP 93.723 ATCP 93.723Trust fund.
ATCP 93.723(1)(1)To use a trust fund to meet the financial responsibility requirements of s. ATCP 93.705, an owner or operator shall establish a trust fund that conforms to the requirements of this section. The trustee shall be an entity that has the authority to act as a trustee and whose trust operations are regulated and examined by a federal agency or an agency of the state in which the fund is established.
ATCP 93.723(2) (2) The wording of the trust agreement shall be identical to the wording specified in 40 CFR 280.103 (b) (1), except for the following:
ATCP 93.723(2)(a) (a) The instructions in brackets in the agreement shall be replaced by the relevant information and the brackets deleted.
ATCP 93.723(2)(b) (b) If financial responsibility for aboveground tanks within the scope of this subchapter is demonstrated using this method, all of the following changes shall be made:
ATCP 93.723(2)(b)1. 1. Reference in the agreement to underground tanks shall be amended to refer to aboveground tanks.
ATCP 93.723(2)(b)2. 2. Certification that wording is identical to the wording required in 40 CFR 280.103 (b) (1) shall be deleted.
ATCP 93.723 Note Note: A link to 40 CFR 280 is available at the following EPA Web site: http://www.epa.gov/oust/fedlaws/cfr.htm.
ATCP 93.723(3) (3) The trust agreement shall be accompanied by a formal certification of acknowledgment as specified in 40 CFR 280.103 (b) (2).
ATCP 93.723(4) (4) The trust fund, when established, shall be funded for the full required amount of coverage or funded for part of the required amount of coverage and used in combination with other mechanisms that provide the remaining required coverage.
ATCP 93.723(5) (5) If the value of the trust fund is greater than the required amount of coverage, the owner or operator may submit a written request to the department for release of the excess.
ATCP 93.723(6) (6) If other financial assurance as specified in this subchapter is substituted for all or part of the trust fund, the owner or operator may submit a written request to the department for release of the excess.
ATCP 93.723(7) (7) Within 60 days after receiving a request from the owner or operator for release of funds as specified in sub. (5) or (6), the department shall instruct the trustee to release to the owner or operator such funds as the department specifies in writing.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.